Water System Capital Renewal Project – AE1345G1

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Project to evaluate, design, and construct well work, treatment facility, piping and valve replacement, emergency intertie work, flow and pressure boosting stations, general campus water system improvements. Total Budget: $7,278,000  Current Project Phase: Completed Design Consultant: TD&H – Spokane General Contractor: Blue Star Enterprises … Read more

Tawanka Kitchen Hood Replacement – AE1356

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Modernization of the food service overhead cooking hoods in the second floor Tawanka kitchen. Total Budget: $141,344 Current Project Phase: Phase Design Consultant: Dumais Romans – Spokane Valley General Contractor: Kearsley Construction – Spokane, WA EWU Contact: Mike DavisConstruction Project Managerphone: 509.359.7353email: mdavis@ewu.edu RFQ/Bid … Read more

Huston Hall Remodel – AE1358

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Originally planned to do 4,500 square feet of remodeled space in Huston Hall for the Office of Information Technology, the final design resulted in 9,000 square feet of remodeled space. Many of the existing furnishings in HUS will be reused in the new design, … Read more

Theatre/Music/Showalter Stage Upgrade – AE1386

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Phase III is the electrical upgrades in all three buildings. These are all Labor and Industries and code compliance items required to be corrected. Total Budget: $700,000 Current Project Phase: Phase Design Consultant: TD&H – Spokane, WA General Contractor: Silhouette Lights and Staging, Kearsley … Read more

Patterson Hall Remodel (Phase I & II) – AE0614

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Renovation and expansion of Patterson Hall Total Budget: $56,870,000 Current Project Phase: Completed Design Consultant: NAC Architects – Spokane, WA General Contractor: Leone and Keeble – Spokane, WA EWU Contact: Jim MoellerSenior Project Managerphone: 509.359.6565email: jmoeller@ewu.edu

URC Ice Arena Dehumidification System – AE1325

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Design & install a dehumidification system to mitigate condensation & improve the climate control of the University Recreation Center Ice Arena. Total Budget: $310,000 Current Project Phase: Completed Design Consultant: Coffman Engineers – Spokane, WA General Contractor: M. J. Takisaki – Seattle, WA EWU … Read more