Robert Reid Lab School Demolition – AE1427

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Demolition of the Robert Reid Lab School Total Budget: $budget Current Project Phase: Completed Design Consultant: Mountain Consulting Services, Spokane Valley, WA Bernardo|Wills Architects, PC, Spokane, WA General Contractor: Leone & Keeble – Spokane, WA EWU Contact: Dave WaltersConstruction Project Managerphone: 509.359.6166email: dwalters@ewu.edu RFQ/Bid … Read more

Chilled Water Capacity Upgrade – AE1484

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Project is to design and construct new chilled water supply and primary electrical for the new Interdisciplinary Science Center.  Currently funded for design only. Total Budget: $4,830,000 Current Project Phase: Design Design Consultant: MSI Engineering, (Meulink Stauffenberg, Inc.), Spokane, WA General Contractor: EWU Contact: … Read more

Electrical Capacity Upgrade – AE1483

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Required Electrical Upgrade to meet the electrical needs of the ISC building. Total Budget: $400,000 Current Project Phase: Design Design Consultant: NAC Architecture – Spokane, WA EWU Contact: Steve SchmeddingSenior Project Manager – Facilities Engineerphone: 509.359.4205email: sschmedding@ewu.edu RFQ/Bid Information: Bid (Quest Project #) Bid … Read more

Tunnel Transformer Replacement Zone 1 – AE1509

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Transformer that power parts of the steam tunnel failed and cannot be repaired; new transformer, emergency generator and associate electric devices will be replaced (JOC) Total Budget: $85,000 Current Project Phase: Phase Design Consultant: NAC Architecture General Contractor:  Burton Construction EWU Contact: Steve SchmeddingSenior … Read more

Rozell Parking Lot & Access Drive Reconstruction Project – AE1419

<a href="https://inside.ewu.edu/facilities/news/projects/" title=" < return to projects page Scope of Work: Replace parking lot that was removed due to the need to mitigate the Bunker C oil tanks adjacent to Rozell Plant. Total Budget: $400,000 Current Project Phase: Phase Design Consultant: TD&H, Spokane, WA – Dan Wolf General Contractor:   EWU Contact: Steve SchmeddingSenior Project … Read more